by Editor | Dec 11, 2023 | Uncategorised
We’re proud to announce that we have achieved our first year of Planet Mark Business Certification for reporting year 2022 – 2023. We are committed to cutting our measured footprint annually. Planet Mark is a leading carbon reduction and net zero specialist. With over...
by Editor | Sep 27, 2023 | Uncategorised
Project: Walkers Pepsi Location: Lincoln Sector: Wastewater Details: Smith + Cork were contracted for the design and build of a new bespoke wastewater treatment plant for a global food manufacturer. The wastewater plant consisted of a new rotary screen, induced air...
by Editor | Jun 30, 2020 | News
A complete automatic control system was designed, manufactured and installed to monitor and maintain environmental conditions within the pool area. The control system manages the pool water temperature, pool air temperature, changing area temperatures, pumping and...
by Editor | Jun 30, 2020 | News
Smith & Cork completed the design, manufacture and installation of this 2500A switchboard. The switchboard included a section for G99 controls. Each of the ACB’s were motorised to allow fully automatic control and island mode operation of 5 standby generators. We...
by Editor | Jun 30, 2020 | News
This project currently holds the record for the fastest turnaround ever! Smith & Cork were approached by a leading national standby power provider to assist with the electrical installation and switchboard manufacture for 2 x 250kW gas engines. A design was...