The project was undertaken to replace the ageing gas fired heating boilers and circulating pumps. The old control system was also replaced. A new plantroom was built to house the new boilers and control panel, whilst the pump sets within the existing plantroom were to be replaced. Smith & Cork Electrical designed and implemented a design utilising some of the plants existing wiring together with new circuits for the new plantroom. An EasyIO control system with 8″ colour HMI have been installed. We also installed a Delta 3G router to maintain connection with the plant for remote diagnosis an monitoring.